This site is secured using RapidSSL
Case Studies

Bathroom, Cornelly

Project Completed 07 July 2018

We carried out a complete refurbishment of the bathroom to include removing an existing stud partition wall, dropping the ceiling height, plaster boarding and ......

Bathroom, Glyncorwg

Project Completed 07 July 2018

Here we removed the existing shower enclosure and sanitary ware and fitted a large low profile shower tray with an electric shower and sliding shower door A ......

Bathroom, Margam

Project Completed 07 July 2018

An image from Bathroom, Margam Village
The existing bathroom suite was removed and a double ended bath with white gloss wooden bath panels was fitted Fitted bathroom units were installed along one ......

Bathroom, Litchard

Project Completed 06 July 2018

This project was a complete rearrangement of the existing layout whereby we built a shower enclosure with recessed shelves and lights, a bespoke vanity unit ......

Bathroom, Sandfields

Project Completed 06 July 2018

The original bathroom and shower enclosure were removed together with the soil and vent boxing A “P” shaped shower bath was fitted with a ......



©Project Tile & Bathrooms 
Plot 11, Unit 1A
Heol Mostyn
Village Farm Industrial Est.
Pyle, Bridgend
CF33 6BJ
Tel: +44 (0)1656 858744
Mob: +44(0)7792 142585
 
Warning!!! Warning!!! Cookies are disabled Warning!!! Warning!!!